Skadi Design Build
Whole-home remodel with vaulted ceiling, exposed wood beam, and a mountain valley view

One team for residential and light commercial remodels.

Tenant improvements · Kitchens · Bathrooms · Basements · Additions · ADUs

Since 2019 Skadi Design-Build has been helping customers in the Salt Lake Valley and surrounding areas with all aspects of their remodel needs, completing design, permitting and construction.

The Design-Build Difference

One point of contact, not multiple companies to manage.

Design-Build is a project delivery method where the designer and builder are part of the same team; that helps avoid issues between the designer and builder that may leave you the customer stuck in the middle.

Small and midsize projects typically can be designed by us, in-house (with your input of course). Larger or more complex projects, we may bring in an outside designer and/or engineer but we manage them to make sure you keep one point of contact.

Already have a designer or your own plans? Not a problem, we are happy to work with you on that as well.

Open-concept kitchen remodel with glass-front white upper cabinets and blue-gray lower cabinets, opening into the living room

What we build

We can handle most any residential or light commercial project. Our most typical projects are:

Whole-home remodel with a stone fireplace and the kitchen visible in the background

Whole Home Remodels

Whether you are purchasing a home in need of an update or ready for a change of scenery at your home, we have the experience to execute large whole-home remodels.

Kitchen remodel with stone countertops, a farmhouse sink, and a row of windows above

Kitchen Remodels

One of the most common remodels we take on — new layout, cabinetry, countertops, and finishes built to last.

Bathroom remodel with patterned accent wallpaper, live-edge wood backsplash, and brass double-vanity fixtures

Bathroom Remodels

From a vanity refresh to a full gut, we handle the plumbing, tile, and finish work start to finish.

Finished basement with wide-plank hardwood flooring and recessed lighting

Basement Finishing

Whether you are in a new home or old, finishing a basement can add much more living space.

Light commercial tenant improvement build-out with open office desks and a glass-walled meeting room

Light Commercial Tenant Improvements

Need to convert a conference room into offices or vice-versa? Needs change over time, we can help with that.

Custom fireplace mantle and trim carpentry remodel

Custom Trim Carpentry and Built-Ins

Large, built-in entertainment centers of the 90's are dead but sleek, modern floating shelves, custom mantles or storage in that awkward nook in your home and other custom carpentry are as relevant as ever.

Post-disaster reconstruction remodel completed by Skadi Design Build

Post Disaster Reconstruction

Burst pipes, backed up sewers or water intrusion can cause all kinds of damage. Many companies specialize in getting the damaged material out and the area safe, we specialize in making it as good as (or better than) it was.

Addition remodel with a bathroom sink and laundry area

Additions & ADUs

Adding a sunroom off the back of your house to enjoy morning coffee or an ADU above your garage for some additional revenue — we can work through the design, permits and construction for you.

How a project starts with us

Each project is unique so each approach is unique but they all start with an on-site consultation where we discuss the project scope, your budget and timelines. Depending on the complexity of the project, there is an iterative process where scope gets better defined as decisions are made and pricing gets more accurate based on design decisions. For simple bath remodels this process can be done in just a couple of days, for jobs involving engineering, specialty materials, or other complicating factors it could take weeks. Click below to see a flowchart of the process.

See the full process
Chart showing that the ability to influence the final design is highest early in the project timeline while the cost of implementing design changes rises sharply later on

Recent Work

Projects around Salt Lake, Summit, Wasatch, Utah and Davis Counties

View all projects
Basement kitchenette remodel with navy shaker cabinets, white uppers, and brass hardware
Oakley kitchen remodel
Chatterton kitchen remodel
Alta Hills basement bathroom remodel

Ready to talk about your project?

Tell us the scope, and we'll walk you through what design-build looks like for your space.

Call Now
Consultation